Last time we worked on the insulation of the plinth at Paks. Since then we finished the engineering works and the electrical installation.
The next step will be the concreting of the floor slab.
New and old photos at the References page.
Take a look at the Related posts to see what happened before at Paks.
Visit back later, will woth it!